合拢与体系转换工艺流程图.doc

返回 相似 举报
合拢与体系转换工艺流程图.doc_第1页
第1页 / 共1页
亲,该文档总共1页,全部预览完了,如果喜欢就下载吧!
资源描述:
Workmanship flow chart for closing segment and system transation Locking permanent bearing, removing temporary bearing Hanged s of No.1 closing segment, tying reinforcement Setting up heavy water tank Welding shape steel support Tensioning temporary priestess bond Setting up heavy Water tank Survey elevation of observing point before grouting concrete Grouting concrete of No.1 Survey elevating of observing point after grouting concrete Take away heavy water tank Curing and removing s Survey elevation of observing point Before tensioning Tensioning and pouring Survey elevation after tensioning No.2 and No.1 closing segment construction in cycles Adjust construction s elevation of No.2 closing segment Reject locking permanent bearing. Finishing turning of whole bridge system
展开阅读全文

资源标签

最新标签

长按识别或保存二维码,关注学链未来公众号

copyright@ 2019-2020“矿业文库”网

矿业文库合伙人QQ群 30735420